Prepare the Site and Handover Before Opening
Site preparation should confirm the finished room dimensions, floor condition, structural and anchoring requirements, clear ceiling height, delivery route, temporary storage, construction access, power and lighting, fire protection interfaces, and coordination with other contractors. The installation scope should assign responsibility for unloading, assembly, anchoring, electrical work, cleanup, and correction of site conditions.
At handover, compare the installed structure with the approved drawings and equipment list. Check positions, dimensions, connections, fasteners, padding, enclosure, access points, slide exits, activity boundaries, labels, circulation, and building interfaces. Record deviations and complete corrections before the affected area enters service.
Opening also depends on project-level readiness. The operator should complete the building, fire, accessibility, staffing, supervision, cleaning, inspection, maintenance, emergency, and local approval work required for the venue. Keep approved drawings, component and material records, installation records, inspection results, maintenance instructions, and corrective-action records with the project file.
Plan Installation and Handover