recherche de produits

Commercial Indoor and Outdoor Play Systems

custom jungle gym

Mimuplay is the brand for these commercial custom jungle gyms, and Zhejiang Xitian Education Technology Co., Ltd. is the manufacturer. Each project is configured around the floor plan, intended age range, play activities, visual theme, and destination market.

Choose the Right Jungle Gym for Your Site

A custom jungle gym should begin with the setting and the way the space will operate. Indoor structures fit family entertainment centers, shopping malls, indoor amusement venues, restaurants, cafés, and educational facilities. Outdoor structures suit community parks, kindergarten or nursery grounds, shopping center plazas, resorts, hotels, and shared residential recreation areas.

Indoor and outdoor projects require different structural and material decisions. Mimuplay's indoor models use galvanized steel framing with padded platforms, panel components, engineering plastics, and PU or PVC coverings. The featured outdoor models combine LLDPE engineering plastic with galvanized steel supports, platforms, stairs, and guardrails.

Define these project inputs before choosing a starting model:

  • Clear floor area, boundary shape, ceiling height, columns, doors, and fixed obstructions
  • Indoor or outdoor installation, including local climate and exposure for outdoor sites
  • Intended ages, expected attendance, supervision plan, and desired challenge level
  • Priority activities, such as climbing, crawling, sliding, balancing, imaginative play, or quieter activities
  • Entrance, exit, circulation, emergency access, and accessible route requirements
  • Destination, target opening date, budget framework, and requested delivery scope
Send Your Site Details

Customize the Layout, Activities, and Visual Theme

Customization starts with the play route. Platforms, stairs, bridges, crawl passages, climbers, slides, activity panels, ball play, and open floor activities can be arranged to create an age-appropriate sequence within the available footprint. Multiple routes can distribute movement across the structure and give children choices at key junctions.

The layout also has to support the operator. Entrances and exits should be easy to monitor, enclosed areas need practical access for inspection and cleaning, and high-energy activities should not discharge into queues or quieter zones. Outdoor layouts must also reserve the required use areas around elevated and moving activities.

Colors, themed forms, decorative panels, and brand elements can be developed around a venue concept. These visual choices are resolved alongside material, visibility, maintenance, fabrication, and destination requirements so the approved theme can be manufactured and installed as documented.

Discuss Your Theme and Activity Mix

Custom Jungle Gym Configurations

Use these four configurations as design starting points. The final footprint, activity mix, colors, technical documents, and delivery scope are confirmed for the actual site.

A wide indoor configuration with green framing, purple slides, a ball pool, elevated play decks, climbing routes, and open activity areas.

Aire de jeux intérieure MHA-1009

MHA-1009 is an indoor play structure for projects that want several activity zones across an irregular or elongated floor plan. The illustrated configuration combines elevated routes, slides, ball play, climbing elements, and open floor activities in a green and purple theme.

Caractéristiques techniques principales

  • Intended age3 à 15 ans
  • Listed area100–200 m² (approximately 1,076–2,153 ft²)
  • Cadre principal48 mm diameter galvanized steel tube with 1.5 mm wall thickness; 2 mm wall thickness for structures above two levels
  • Fittingsmalleable iron
  • SleevesPVC
  • Internal plastic componentsengineering plastic
  • CoveringsPU or PVC; platform coverings primarily PVC and decorative coverings primarily PU
  • Platform build18 mm multilayer board, 20 mm pearl cotton padding, and PVC covering
  • Side panels and decorative windowsprimarily 18 mm multilayer board, 10 mm foam, and PU covering
A pink and mint indoor playground concept with enclosed multilevel routes, slides, ball play, transparent activity panels, and open floor features.

Aire de jeux intérieure MHA-1008

MHA-1008 is an indoor play structure with a pastel theme and a compact linear arrangement of enclosed activity bays. The illustrated concept includes multilevel play, slides, ball activities, crawl-through elements, and ground-level play features.

Caractéristiques techniques principales

  • Intended age3 à 15 ans
  • Listed area100–200 m² (approximately 1,076–2,153 ft²)
  • Cadre principal48 mm diameter galvanized steel tube with 1.5 mm wall thickness; 2 mm wall thickness for structures above two levels
  • Fittingsmalleable iron
  • SleevesPVC
  • Internal plastic componentsengineering plastic
  • CoveringsPU or PVC; platform coverings primarily PVC and decorative coverings primarily PU
  • Platform build18 mm multilayer board, 20 mm pearl cotton padding, and PVC covering
  • Side panels and decorative windowsprimarily 18 mm multilayer board, 10 mm foam, and PU covering
An orange, purple, gray, and black robot-themed outdoor structure with connected platforms, activity panels, stairs, and a curved slide.

Aire de jeux extérieure MHO-1018

MHO-1018 is an outdoor play structure built around a connected row of platforms with a stair entrance and slide exit. Its robot-inspired panels and compact route make it a starting point for a focused outdoor play zone.

Caractéristiques techniques principales

  • Intended age3 à 15 ans
  • Listed area100–200 m² (approximately 1,076–2,153 ft²)
  • Molded componentsLLDPE engineering plastic
  • Main support tubesØ114 × 2 mm galvanized steel
  • Platforms and stairs2 mm galvanized steel sheet with PVC-coated or powder-coated finish options
  • GuardrailsØ32 mm or Ø25 mm × 2 mm galvanized steel tube
A green and yellow outdoor playground concept with several tower decks, enclosed connectors, open bridges, climbing access, and multiple slides.

Aire de jeux extérieure MHO-1017

MHO-1017 is a visual concept with multiple towers, connecting passages, and several slide exits. It suits projects that want children to move between distinct elevated play zones within one coordinated outdoor structure.

Caractéristiques techniques principales

  • Intended age3 à 15 ans
  • Listed area100–200 m² (approximately 1,076–2,153 ft²)
  • Molded componentsLLDPE engineering plastic
  • Main support tubesØ114 × 2 mm galvanized steel
  • Platforms and stairs2 mm galvanized steel sheet with PVC-coated or powder-coated finish options
  • GuardrailsØ32 mm or Ø25 mm × 2 mm galvanized steel tube

From Site Brief to Approved Production Design

1. Define the project brief

Use the project inputs listed above to create the design brief. Add photos or videos that show columns, walls, access points, outdoor grades, and other constraints that may be difficult to read from a plan.

2. Develop the layout

Mimuplay selects a suitable configuration and organizes the main play routes, entrances, exits, circulation, activity zones, and operator sightlines. The concept places the equipment within the actual boundaries and shows fixed obstructions, access points, and movement routes.

3. Review technical inputs

The review covers structure, components, materials, interfaces, use areas, protective measures, access for inspection, and the requirements identified for the destination. Building, fire, accessibility, and operational conditions must be coordinated with the parties responsible for the site.

4. Approve the design version

Confirm the layout, activity list, colors, graphics, component schedule, and agreed technical documents. Record revisions and approve one controlled version before production so later changes can be evaluated for cost, schedule, and technical impact.

5. Manufacture and prepare delivery

Production follows the approved version. The commercial offer should identify the equipment, documents, packaging, spare parts, transport, and services included in the order.

6. Install, inspect, and hand over

Installation is checked against the approved drawings and equipment list. Handover records should capture deviations, corrections, inspection status, operating information, and the responsibilities accepted by the supplier, installer, site owner, and operator.

Start With a Dimensioned Site Plan

Set Safety, Accessibility, and Operating Requirements Early

The applicable requirements depend on the product category, intended users, public or private setting, destination, and final configuration. An indoor soft-contained system and an outdoor public playground can fall under different rules even when both are described as jungle gyms. Confirm the product category before specifying standards or requesting tests.

Ask for documents that identify the actual model or approved configuration, standard and edition, test or inspection scope, date, result, and issuing organization. A general certificate image or a report for a different sample does not establish coverage for a customized project.

The design review should address the full play system: access and exit routes, platform protection, openings, entrapment points, fasteners, fall heights, use zones, impact-attenuating surfacing, slide exits, climbing routes, adjacent activities, emergency access, inspection access, and operator visibility. Custom changes that affect materials, structure, layout, or intended use may require the evidence package to be reviewed again.

Accessibility is planned across the visitor journey. Coordinate the site entrance, gates, routes, turning and resting space, transfer or ramp solutions, activity choices, signs, caregiver access, and supporting facilities with the project's applicable requirements and intended users.

Add Project Requirements to Your Inquiry

Build a Quote That Can Be Compared Line by Line

A useful quote is based on the same project inputs for every bidder. Jungle gym cost changes with the footprint and height, number of levels, structural arrangement, activity mix, material specifications, theme complexity, graphics, required documents or testing, order quantity, packaging, destination, schedule, and installation scope.

Request a written breakdown that identifies:

  • Equipment and component list tied to the approved layout
  • Design work, drawings, manuals, and other project documents
  • Materials, finishes, graphics, and optional items
  • Required inspections, tests, and supporting records
  • Export packaging and spare or replacement parts
  • Freight basis, named port or place, and the agreed Incoterms version when used
  • Unloading, storage, site work, installation, inspection, and training responsibilities
  • Taxes, duties, permits, and third-party work handled outside the equipment order
  • Production and shipping milestones, quote validity, payment terms, and change procedure
  • Warranty scope, service method, response process, and chargeable support

Provide the delivery city and ZIP code when requesting freight. A complete comparison should use the same destination, currency, configuration, service boundary, and schedule assumptions.

Demander un devis détaillé

Prepare the Site, Installation, and Operating Handoff

The site team should verify dimensions, access, foundations or anchoring conditions, floor and wall interfaces, drainage for outdoor projects, delivery and lifting routes, storage space, utilities, and construction sequencing before shipment. Indoor projects also need coordination with the building's fire, egress, accessibility, and occupancy requirements. Outdoor projects require the finished grade, surfacing build-up, drainage, and use areas to match the approved plan.

Mimuplay states that it can provide installation instructions and videos for local installers, with onsite technical installation available for larger projects by arrangement. Put the selected installation method, travel or labor charges, tools, lifting equipment, site responsibilities, and completion criteria into the commercial agreement.

Before opening, compare the installed equipment with the approved drawings and component list. Record anchoring, connections, guards, surfacing, clearances, signs, corrected deviations, and the status of project-level inspections or permits. Train the operating team on opening checks, cleaning, routine inspection, fault isolation, maintenance records, and the process for returning a repaired area to service.

Plan d'installation et de remise

Tell Us About Your Custom Jungle Gym Project

Complete the form and enter your site dimensions, tender specifications, required documents, and theme direction in the project requirements field. Send floor plans or reference files to sales@mimuplay.com and include your company or project name so they can be matched to your inquiry.

  • Téléphone : +86 13587751007
  • E-mail : sales@mimuplay.com
  • WhatsApp : +86 13587751007
  • Adresse : Zone industrielle de Xiaojingao, ville de Qiaoxia, Wenzhou, Zhejiang, Chine

Complete your name, email, company, region, and project requirements. Include the city and ZIP code for a freight-based quote.